Capital Works Fund Plan

10-Year Capital Works Fund Plan
for NSW Strata

Built around your building, not a template — and ready for the 1 April 2026 standard form. We prepare your plan from a personal, on-site inspection by our Director James, then walk your committee through the form and associated files.

2026 standard form readyPersonal site inspection by JamesTransparent published pricing from $1,295+GST

What changed on 1 April 2026

The NSW strata regulations were amended on 1 April 2026, introducing a new prescribed standard form that every newly prepared or reviewed 10-year capital works fund plan must now use. It is the most significant change to capital works planning in a decade — and most committees do not yet know it has happened.

The new form requires four things in particular:

  • Life-cycle costing of each major element — based on the condition of your actual building, not generic industry-average tables.
  • Sustainability inclusions — EV charging, solar, energy efficiency and water.
  • A climate resilience assessment — drainage, salt exposure and thermal performance, which matters most for coastal and harbour-facing buildings.
  • A consistent, plain-English presentation your committee and lot owners can follow.

Plans dated before 1 April 2026 stay valid until their next review cycle — but every plan prepared or renewed from that date forward must use the new format. If your review is due, now is the time to move.

What you get

  • 10-year forecast on the 2026 standard form
  • Life-cycle costing of every major building element — roof, waterproofing, facade, services, fire systems, common-area finishes
  • Year-by-year levy contribution schedule
  • Sustainability inclusions assessment (EV charging, solar, energy efficiency, water)
  • Climate resilience review — important for coastal and harbour-facing buildings
  • Photo register from the on-site inspection
  • Plain-English executive summary for the committee
  • Editable digital copy (PDF + Excel financial model)
  • One revision included within 30 days
  • 30-minute walkthrough call with your committee chair or secretary

Pricing

A 10-year capital works fund plan in NSW typically costs between $1,800 and $5,500+GST, depending on the size of the scheme. At Finer Property a Full 10-Year Plan starts at $1,295+GST for schemes of 4 lots or fewer and is priced purely by building size — published in full below, not quoted on request.

Are you a 2-lot strata scheme? Under NSW law, 2-lot schemes may be legally exempt from the 10-year capital works fund plan requirement if (a) the buildings are physically detached, (b) there are no buildings outside the lots, and (c) the owners pass a unanimous resolution. Before we quote, our free 15-minute discovery call helps you confirm whether you actually need a plan. If you qualify for exemption, we will tell you so — even if that means no fee to us. Read more about the 2-lot exemption →

Building sizeFull 10-Year PlanPlan Refresh
4 lots or fewer (Micro)$1,295+GST$975+GST
5–9 lots$1,795+GST$1,345+GST
10–20 lots$2,495+GST$1,875+GST
21–40 lots$3,495+GST$2,625+GST
41+ lotsQuoteQuote

Plan Refresh eligibility: Refresh pricing applies when your existing plan has 5 or more years of usable life remaining — in practice, a plan prepared in the last 5 years that has not yet reached its statutory review point. If 4 years or fewer remain, the plan is effectively at end-of-life and Full Plan pricing applies. All prices exclude GST.

Already a Monthly Care Package client? You receive 15% off your 10-Year Capital Works Fund Plan. We can also bundle the plan with a Stage 2 on-site report at a single site visit for a combined saving.

No obligation — we confirm your fixed price on the call before you commit to anything.

How it works

Step 1

Free 15-minute discovery call

We agree scope and confirm a fixed price. For 2-lot schemes, we screen for the SSMA exemption pathway before we quote — so you only commission a plan if you actually need one.

Same week

Step 2

You send us your building's records

The strata plan, your current capital works fund plan (if any), maintenance history, recent inspection or defect reports, your latest AGM minutes, your current capital works fund balance, and your current levy schedule.

1–3 days

Step 4

We prepare your plan

Plan preparation back at the office, using life cycles specific to your building rather than generic industry averages.

10–15 business days

Step 5

Delivery and walkthrough

We deliver the plan and walk your committee through the new document, the year-by-year levy schedule, and the sustainability inclusions on a 30-minute call.

30 minutes

Step 3 is the difference. A traditional 10-year plan is prepared by someone at their desk reading documents; we prepare yours by being in the building.

Why this is different

A Traditional 10-year PlanA Finer Property Plan
Desk-prepared from documentsBuilt from a personal site inspection
Generic industry-average life cyclesBuilding-specific, condition-based life cycles
Engineering-style reportPlain English, committee-ready
Usually price on request onlyTransparent pricing, published on this page
Mostly sells to strata managersTalks to committees or managers directly
Limited follow-up30-minute walkthrough call included

Who this is for

Self-managed committees

1 to 20 lots, running the building yourselves. You want a professional plan you can stand behind at the AGM — not a DIY spreadsheet you are unsure about.

Committees with a strata manager

Useful when your manager does not have a captive quantity surveyor, or when you simply want an independent, on-site assessment of your building.

Strata managers needing a partner

Refer your portfolio buildings to us. You keep the client relationship; we deliver the on-site inspection and the completed plan.

Where we work: We're based in Chatswood on Sydney's North Shore and prepare 10-year plans for strata schemes across greater Sydney. Because a plan is a one-off, on-site engagement rather than ongoing care, we can also travel further afield for the right building — tell us where you are and we'll let you know.

Get a Plan Quote

Tell us about your building and we'll be in touch within 1 business day. Here's what happens next:

  1. We reply within 1 business day to find a time that suits.
  2. Free 15-minute discovery call — we agree scope and, for 2-lot schemes, screen the exemption before quoting.
  3. Fixed price confirmed — no surprises, and no obligation to proceed.

Prefer email? Write to [email protected]. Finer Property Services reserves the right to decline plans for buildings outside our service area or capabilities.

Frequently asked questions

Do I need a 10-year capital works fund plan?

Almost certainly. Under Section 80 of the Strata Schemes Management Act 2015, every owners corporation in NSW must prepare and maintain a 10-year capital works fund plan. The main exception is certain 2-lot schemes, which may be exempt if the buildings are physically detached, there are no buildings outside the lots, and the owners pass a unanimous resolution. If you are a 2-lot scheme, we will help you confirm whether you qualify before you commit to anything. Book a free 15-minute discovery call and we will tell you where you stand.

When do I need to update an old plan to the 2026 format?

Plans dated before 1 April 2026 remain valid until their next review point. The plan must be reviewed at least once every five years, so the trigger is your next scheduled review — or any major works that change the picture. If your existing plan still has five or more years of usable life left, you likely qualify for our lower Refresh pricing. If it is at or near end-of-life, a full rebuild on the new standard form makes more sense. We will assess this for you on the discovery call.

What does the new 2026 standard form require?

From 1 April 2026, newly prepared or reviewed plans must use a prescribed standard form. It introduces four notable additions: life-cycle costing for each major building element rather than generic industry averages; sustainability inclusions such as EV charging, solar, energy efficiency and water; a climate resilience assessment covering drainage, salt exposure and thermal performance; and a consistent presentation that committees and lot owners can actually follow. These requirements reward on-site judgement — which is exactly how we prepare every plan. See our Capital Works Fund guide for the full detail.

How much does a capital works fund plan cost in NSW?

Most NSW providers quote on request only. We publish our pricing. A Full 10-Year Plan starts at $1,295+GST for schemes of 4 lots or fewer, $1,795+GST for 5 to 9 lots, $2,495+GST for 10 to 20 lots, and $3,495+GST for 21 to 40 lots. Larger schemes are quoted individually. If your existing plan still has five or more years of usable life, a Plan Refresh costs significantly less than the full price. The price is fixed at the discovery call — no surprises. See the pricing table above.

Do small strata schemes (under 10 lots) really need a plan?

Yes, with one exception. Schemes of three or more lots are required to have a plan, and a professional plan protects what is usually a multi-million-dollar shared asset. Only certain 2-lot schemes can be exempt — and only if the buildings are detached, there are no buildings outside the lots, and the owners pass a unanimous resolution. For very small buildings we created a Micro tier so the cost per owner stays proportionate. If you are a 2-lot scheme, our free discovery call screens your exemption first, before any quote.

Who is qualified to prepare a capital works fund plan?

There is no single mandated licence in NSW, which is exactly why who prepares your plan matters. Many plans are produced from documents at a desk. We take a different approach: James inspects your building in person, assesses each major element on site, and prepares the plan around what your building actually needs — not a generic template. He also signs it, presents it, and stands behind it. Talk to us about how we work before you commission anyone.

How long does it take?

From the discovery call to delivery is usually about three to four weeks. We can normally schedule the discovery call in the same week you enquire. Once we have your building's records — strata plan, current plan, AGM minutes, fund balance and levy schedule — the on-site inspection takes one to three hours, and we deliver the completed plan within 10 to 15 business days. We finish with a 30-minute walkthrough call for your committee. Get in touch and we will map out the timeline for your building.

Can you work alongside our strata manager?

Yes, and we do this often. Your strata manager keeps the client relationship; we provide the independent, on-site assessment and the completed plan. This suits committees whose manager does not have an in-house quantity surveyor, time to walk the building and complete the form themselves, or who simply want an independent set of eyes on the building. We are happy to coordinate directly with your manager on access, records and delivery. Mention your manager when you enquire and we will make the process seamless.

Related resources

Capital Works Fund Guide

What a capital works fund is, your obligations under Section 80, and what a 2026-compliant plan should include.

Read the guide

NSW Strata Maintenance Obligations

How the capital works fund fits alongside your broader repair-and-maintenance duties as an owners corporation.

Read more